Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa regionWairarapa region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 2518 September 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 2

Location

Type of work

Start date

Mt Bruce
Dig outs and resurfacing.  Traffic will be controlled by stop/go and a temporary speed limit in place while work is underway.

Dig outs

Monday to Wednesday daytime

Carterton
Lane closures will be in place while crews dig out and resurface small sections of the highway through Carterton.

Dig outs

Tuesday to Thursday nights

Featherston
Traffic will be controlled by stop/go between Revans Street and Moore Street while crews dig out and resurface small sections of the highway through Featherston.

Dig outs

Thursday to Friday

Rimutaka Hill Road
Traffic controlled by stop/go while crews work on an underslip.

Underslip repair

Tuesday to Friday

Rimutaka to Kaitoke
Crews are clearing slips. Traffic will be controlled by stop/go while work is underway.

Slip clearing

Monday to Wednesday

SH53 between Featherston and Martinborough
Lane closures and stop/go will be in place while crews dig out and resurface small sections of the highway between Featherston and Martinborough.

Dig outs

Wednesday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Location

Type of work

Start date

Rimutaka Hill Road Bridge 6
Traffic will be controlled by stop/go for guardrail  and underslip repairs.

Guardrail and underslip repairs

Monday to Friday

Rimutaka Hill Road
Traffic controlled by stop/go to allow crews to repair an electronic sign. 

Repair Electronic Warning Sign

Tuesday

Te Marua to Kaitoke
Crews are clearing slips. Traffic will be controlled by stop/go while the work is underway.

Slip clearing

Tuesday

Mt Bruce
Dig outs.  Traffic will be controlled by stop/go while the work is underway.

Dig outs

Monday

Note: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>