Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region.

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 25 September 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Location

Type of work

Start date

Churton Park to Tawa – S-bends
Traffic controlled by stop/go to allow crews to to clear slips.

Tree removal

Monday to Tuesday days
5am-1pm

Mana Esplanade
Weather permitting, Monday and Tuesday nights at Plimmerton applying a 30mm top surface from Pope St to near the Plimmerton roundabout Wednesday and Thursday at south Mana Esplanade excavating and filling with dense asphalt to repair the road.Major resurfacing works at night along Mana Esplanade. Traffic will be controlled by stop/go. 

Resurfacing

Sunday to Thursday nights

North of Pukerua Bay and Coast Road
Asphalt repairs. Traffic will be controlled by stop/go.  

Repairs

Monday to Tuesday nights

North of Paekakariki township
Asphalt repairs. Traffic will be controlled by stop/go.  

Repairs

Wednesday night

Raumati Straights - Mackays to Peka Peka Expressway
Works upgrading highway shoulder and installing guardrail.

Expressway works

Monday to Friday days

Peka Peka - Mackays to Peka Peka Expressway
Works upgrading highway shoulder and installing guardrail.

Expressway worksSunday to Thursday nights

Otaki
Asphalt repairs. Traffic will be controlled by stop/go.  

RepairsWednesday night

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>