Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 2416 October 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Location

Type of work

Start date

Location

Type of work

Start date

Mana EsplanadePeka Peka
Lane closuresTraffic controlled by stop/go to allow crews to work on the Peka Peka tie-in for manhole raising works.the new expressway.

Repair and maintenanceExpressway roadworks

FridaySunday to Thursday nights

Otaihanga to ParaparaumuMana Esplanade
Lane closures for drainage clearing works.Major resurfacing works at night along Mana Esplanade. Traffic will be controlled by stop/go.  For further information.  

Drainage worksResurfacing

FridaySunday to Wednesday night

Coast Road
Traffic will be controlled by stop/go for to allow crews to resurface sections of the road (mill and fills).

Resurfacing

TuesdaySunday to WednesdayThursday night

Vivian Street
Lane closures to enable crews to do cable and detours for resurfacingducting work.

ResurfacingRoutine maintenance

TuesdaySunday to Thursday night

Otaihanga roundbaoutJohnsonville onramp
Lane closure so(but onramp still open) to enable crews can installto work on lighting poles.

Lighting pole replacement works

WednesdayTuesday night

Otaki to Te HoroPukerua Bay (south of Gray St)
Road surface repairTraffic will be controlled by stop/go for resurfacing (mill and fill) works. Altered road layout while crews are working.

RepairMill and maintenancefills

Wednesday night

State Highway 2

Location

Type of work

Start date

Location

Type of work

Start date

Rimutaka Hill Road
Traffic will be controlled by stop/go for guardrail and maintenance repairs.

Guardrail and maintenance repairs

Tuesday to Friday

Ngauranga to Petone
Lane closures for barrier repair works.

Barrier repairs

Thursday night

State Highway 58

Location

Type of work

Start date

No maintenance work on SH58 this week

 

 

Haywards
Ongoing work by Lanes Flat for Transmission Gully.

 Construction

Monday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Dowse Offramp
The offramp will be closed and traffic diverted so crews can repair guardrails and pipes.  Please follow the signed detour.  Work may extend to Monday night.

Guardrail and pipe repairs

Sunday night

Greytown (by fruitstalls – Hupenui Road)
Traffic will be controlled by stop/go to enable dig out repairs prior to resurfacing work in November.

Dig outs

Thursday night

Rimutaka Hill Road
Traffic will be controlled by stop/go for guardrail  and underslip repairs.

Guardrail and underslip repairs

Monday to Wednesday

Kaitoke
Traffic will be controlled by stop/go for tree maintenance and pre seal dig outs at a number of locations. 

Tree maintenance and pre seal dig outs

Wednesday and Thursday

Featherston
Traffic will be controlled by stop/go while dig out repairs and resurfacing work is underway. Work site is near the intersection of SH2 and SH53.

Dig outs & Resurfacing

Monday to Wednesday

State Highway 58

Location

Type of work

Start date

Pauatahanui Inlet (near James Cook Drive)
Traffic will be controlled by stop/go to establish a site access off the highway towards Duck Creek for a new housing development.

Site access establishment

Sunday night

Haywards Interchange
Traffic will be controlled by stop/go for line marking and the installation of concrete barriers on SH58.

Concrete barrier installation

Monday and Tuesday night

Haywards
Ongoing work by Lanes Flat for Transmission Gully.

 

Monday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.