Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 2416 October 2016 . We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
LocationType of work
Start date
Type of work
Start date
Mana Esplanade | Repair and maintenance | Friday |
Otaihanga to Paraparaumu | Drainage works | Friday |
Coast Road | Resurfacing | Tuesday |
Vivian Street | Resurfacing | Tuesday |
Otaihanga roundbaout | Lighting pole replacement works | Wednesday |
Otaki to Te Horo | Repair | Wednesday |
State Highway 2
LocationType of work
Start date
Type of work
Start date
Rimutaka Hill Road
Traffic will be controlled by stop/go for guardrail and maintenance repairs.
Guardrail and maintenance repairs
Tuesday to Friday
Ngauranga to Petone
Lane closures for barrier repair works.
Barrier repairs
Thursday night
State Highway 58
Location | Type of work | Start date |
No maintenance work on SH58 this week |
|
|
Haywards | Construction | Monday to Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Dowse Offramp
The offramp will be closed and traffic diverted so crews can repair guardrails and pipes. Please follow the signed detour. Work may extend to Monday night.
Guardrail and pipe repairs
Sunday night
Greytown (by fruitstalls – Hupenui Road)
Traffic will be controlled by stop/go to enable dig out repairs prior to resurfacing work in November.
Dig outs
Thursday night
Rimutaka Hill Road
Traffic will be controlled by stop/go for guardrail and underslip repairs.
Guardrail and underslip repairs
Monday to Wednesday
Kaitoke
Traffic will be controlled by stop/go for tree maintenance and pre seal dig outs at a number of locations.
Tree maintenance and pre seal dig outs
Wednesday and Thursday
Featherston
Traffic will be controlled by stop/go while dig out repairs and resurfacing work is underway. Work site is near the intersection of SH2 and SH53.
Dig outs & Resurfacing
Monday to Wednesday
State Highway 58
Location | Type of work | Start date |
---|---|---|
Pauatahanui Inlet (near James Cook Drive) | Site access establishment | Sunday night |
Haywards Interchange | Concrete barrier installation | Monday and Tuesday night |
Haywards |
| Monday to Friday |