Information about roadworks in the Wairarapa region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 136 November 2016 .
Please note: this coming week, weather permitting, crews are busy chipsealing at a number of locations. Please allow plenty of room between you and the vehicle in front and stick to the temporary speed limit.
State Highway 2
Resurfacing
Sunday to Tuesday night
Mikimiki
Traffic will be controlled by stop/go for resurfacing works. A temporary speed limit will be in place.
Chipsealing
Saturday to Thursday
Mikimiki
Traffic will be controlled by stop/go to enable dig out repairs and maintenance works.
Dig outs
Monday to Friday
Rimutaka Hill Road
Traffic will be controlled by stop/go for maintenance repairs and dig outs.
Maintenance repairs
Monday to Friday
North of Carterton
A temporary speed limit will be in place while crews lower the lip of the road the north and southbound lanes.
Road repairs
Monday to Tuesday
State Highway 53
Location | Type of work | Start date |
Traffic will be controlled by stop/go at various locations while crews install “slippery when wet” signage. | Sign intallation | Tuesday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Mikimiki
Traffic will be controlled by stop/go while crews do repair and maintenance work.
Dig outs and stabilisation
Monday to Friday
State Highway 53
Location | Type of work | Start date |
No maintenance works on SH53 this week. |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Location | Type of work | Start date |
Rimutaka Hill Road | Chip sealing |
|
North Topaz Street | Chip sealing | Tuesday to Wednesday |
Kaitoke | Electronic sign board installation | Monday to Thursday |
Greytown - fruitstalls | Second coat seal chip sealing | Monday to Wednesday |
Hutt Road-Ngauranga Traffic will be controlled by stop/go while crews chip seal the overbridge. | Chipsealing | Monday and Tuesday |