Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Nelson, Marlborough and Tasman maintenance programme

$
0
0

Information about roadworks in the Nelson-Marlborough-Tasman region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 2114 November 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 6State Highway 6

Location

Type of Work

Start Date

Whangamoa
Traffic will be controlled by stop/go while crews install guradrail

 

Guardrail Installation

 

Wednesday to Thursday

Korere Straight
Traffic will be controlled by stop/go traffic management for tree maintenance works

 

Tree Maintenance

 

Friday

State Highway 60

Location

Type of Work

Start Date

Riwaka
Traffic will be controlled by stop/go while crews carry out surfacing repairs

 

Pre-seal repairs

 

Monday to Thursday

Hope Saddle
Traffic will be controlled by stop/go while crews remove debris

 

Slip Clearing

 

Friday

State Highway 63

Location

Type of Work

Start Date

No planned roadworks along SH63 this week

 

 

State Highway 65

Location

Type of Work

Start Date

No planned roadworks along SH65 this week

 

 

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night

Location

Type of Work

Start Date

Collins Valley
Traffic controlled by stop/go to carry out pavement repairs

Pavement maintenance

Monday to Friday

State Highway 60

Location

Type of Work

Start Date

Takaka Hill
Road will be down to one lane, controlled by traffic lights, for the construction of a new retaining wall

Construction

Monday to Friday

Riwaka
Traffic will be controlled by stop/go while crews carry out surfacing repairs

Pre-seal repairs

Thursday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night


Viewing all articles
Browse latest Browse all 2629

Trending Articles