Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 1912 February - Saturday 2518 February 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 19 February - Saturday 25 February
Sunday 12 February - Saturday 18 February
State Highway 2
Location
Type of work
Start date
Stop/go traffic control for resurfacingResurfacingMonday 20th – Thursday 23rd
6am to 6pm
Rimutaka Hill Road Stop/go traffic control for weep hole clearing and guardrail repairs. | Maintenance | Monday 20th to Thursday 23rd 8am-4pm |
Rimutaka Hill Road Channel clearing | Maintenance | Tuesday 21st and Thursday 23rd 7pm to 5:30am |
Wairarapa SH2 tourist arrows Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving | Tourist safety | Sunday 19th –Thursday 23rd 7pm-5.30am |
Chapel Street, Masterton Stop/go for resurfacing works | Resurfacing | Monday13th – Friday 17th |
Opaki Road Stop/go for southbound traffic for resurfacing works | Resurfacing | Wednesday 22nd 6pm to 5:30am |
Lennies Road, Opaki Stop/go traffic control for dig outs | Digouts | Wednesday 22nd 7am to 5pm |
State Highway 53
Location | Type of work | Start date |
No planned roadworks this coming week | - | - |
Rimutaka Hill Road, near Bridge No 3
Stop/go traffic control for roadside maintenance
Guardrail repair and drain clearing
Tuesday 14 th
8am-4pm
Rimutaka Hill Road, Bridge No 2
Stop/go traffic control for marking out the road in preparation for planned repairs
Preparation for works
Thursday 16 th
8am-4pm
Wairarapa SH2 tourist arrows
Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving
Tourist safety
Sunday 12 th –Thursday 16 th
7pm-5.30am
Waingawa, Masterton
Lane closure for barrier repairs and line-marking
Barrier repairs and line-marking
Monday13th – Friday 17 th
Mt Bruce
Stop/go southbound traffic control for works to raise level of road shoulder
Road shoulder
Thursday 16 th
8am-40pm
State Highway 53
Location |
Type of work |
Start date |
Revans Road, from Featherston School to 100km zone Lane closed for chipsealing, stop on request Detour for Martinborough traffic via Boundary Road Speed restriction in following days while chip beds in | Chipseal | TBC |