Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 1912 February - Saturday 2518 February 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Sunday 19 February - Saturday 25 February

Sunday 12 February - Saturday 18 February

State Highway 2

      

LocationType of workStart date  

Location

  
  

Type of work

  
  

Start date

  
Rimutaka Hill Road, Twin Bridges
Stop/go traffic control for resurfacing
ResurfacingMonday 20th – Thursday 23rd
6am to 6pm
Rimutaka Hill Road
Stop/go traffic control for weep hole clearing and guardrail repairs.
MaintenanceMonday 20th to Thursday 23rd
8am-4pm
Rimutaka Hill Road
Channel clearing
MaintenanceTuesday 21st and Thursday 23rd
7pm to 5:30am
Wairarapa SH2 tourist arrows
Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving
Tourist safetySunday 19th –Thursday 23rd   
7pm-5.30am
Chapel Street, Masterton
Stop/go for resurfacing works
ResurfacingMonday13th – Friday 17th
Opaki Road
Stop/go for southbound traffic for resurfacing works 
ResurfacingWednesday 22nd
6pm to 5:30am
Lennies Road, Opaki
Stop/go traffic control for dig outs  
DigoutsWednesday 22nd
7am to 5pm

State Highway 53

Location Type of workStart date
No planned roadworks this coming week--

Rimutaka Hill Road, near Bridge No 3

Stop/go traffic control for roadside maintenance

Guardrail repair and drain clearing

Tuesday 14 th

8am-4pm

Rimutaka Hill Road, Bridge No 2

Stop/go traffic control for marking out the road in preparation for planned repairs

Preparation for works

Thursday 16 th

8am-4pm

Wairarapa SH2 tourist arrows

Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving

Tourist safety

Sunday 12 th  –Thursday 16 th 

7pm-5.30am

Waingawa, Masterton

Lane closure for barrier repairs and line-marking

Barrier repairs and line-marking

Monday13th – Friday 17 th

 

Mt Bruce

Stop/go southbound traffic control for works to raise level of road shoulder

 

Road shoulder

Thursday 16 th

8am-40pm

    

State Highway 53

     

  

Location

  
  

Type of work

  
  

Start date

  

Revans Road, from Featherston School to 100km zone

Lane closed for chipsealing, stop on request

Detour for Martinborough traffic via Boundary Road

Speed restriction in following days while chip beds in 

 Chipseal

TBC

 


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>