Nelson, Marlborough and Tasman maintenance programme

$
0
0
Title has changed:NelsonNelson, Marlboroughand Tasman maintenance programme

Information about roadworks in the Nelson and TasmanNelson-Marlborough-Tasman region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Nelson and Tasman regions,Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 2720 February 2017February 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 6

Location

Type of Work

Start Date

Whangamoa
Traffic will be controlled by stop/go while crews construct new drainage channel

Drainage

Monday to Friday

Kohatu – Kawatiri
Traffic will be controlled by stop/go while crews carry out pre seal repairs. There will be two crews working in this area.

Pre Seal Repairs

Monday to Friday

Kawatiri Intersection
Traffic will be controlled by stop/go while crews carry out surface and guardrail repairs

Guardrail and surface repairs

Monday

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night

LocationType of WorkStart Date
Whangamoa - Hira
Traffic will be controlled by stop/go while crews carry out surface repairs
Pre Seal RepairsMonday to Tuesday
Spooners - Kohatu
Traffic will be controlled by stop/go while crews carry out surface repairs
Pre Seal RepairsWednesday to Friday
Clark Valley
Traffic will be controlled by stop/go while crews carry out surface repairs
Pre Seal RepairsWednesday to Friday
Rocks Road
Surface repair work 7PM-11PM
Traffic will be controlled by stop/go while crews are working
Surface repairsMonday to Friday
Kawatiri - Granity Creek
Single lane traffic, controlled by stop/go while crews install the wire rope barrier
Wire Rope Barrier InstallationMonday to Friday

Note:  If bad weather should strike, work will be postponed to the next suitable day / night