Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 5 March19 February - Saturday 11 March25 February 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Sunday 5 March19 February - Saturday 11 MarchSaturday 25 February

State Highway 2

State Highway 2

  

Location

  
  

Type of work

  
  

Start date

  
LocationType of workStart date

Kaitoke, Rimutaka   Hill Road

Stop/go southbound traffic control for road   repairs

Road repairs

Monday 6 th  – Wednesday 8 th

8am-4pm

Tourist arrows

Stop/go traffic control   for installing tactile ‘dot matrix’ directional arrows indicating left-side driving

Tourist safety

Sunday 5 th–Thursday   9 th  

7pm-5.30am

High Street, Masterton

Lane closed for water main renewal

Water supply, Masterton   District Council

Monday 6th – Friday 10 th 

7am-6pm

 

Opaki South

Stop/go traffic control north of Firth Street for road repairs

Road repairs

Tuesday 7 th

8am-4pm

Mt Bruce

Stop/go northbound traffic control for works to raise level of road shoulder

 

Road shoulder

Wednesday 8 th

7am-5pm

 State Highway 53

     

  

Location

  
  

Type of work

  
  

Start date

  

No major works scheduled

 

 

Rimutaka Hill Road, Twin Bridges
Stop/go traffic control for resurfacing
ResurfacingMonday 20th – Thursday 23rd
6am to 6pm
Rimutaka Hill Road
Stop/go traffic control for weep hole clearing and guardrail repairs.
Maintenance Monday 20th to Thursday 23rd
8am-4pm Rimutaka Hill Road
Channel clearing Maintenance Tuesday 21st and Thursday 23rd
7pm to 5:30am Wairarapa SH2 tourist arrows
Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving Tourist safety Sunday 19th –Thursday 23rd   
7pm-5.30am Chapel Street, Masterton
Stop/go for resurfacing works Resurfacing Monday13th – Friday 17th Opaki Road
Stop/go for southbound traffic for resurfacing works  Resurfacing Wednesday 22nd
6pm to 5:30am Lennies Road, Opaki
Stop/go traffic control for dig outs   Digouts Wednesday 22nd
7am to 5pm

State Highway 53

Location Type of workStart date
No planned roadworks this coming week--

Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>