Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 1912 March - Saturday 2518 March . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 1912 March - Saturday 25Saturday 18 March
State Highway 2
Location |
Type of work |
Start date |
South of Bidwills Cutting intersection, Greytown Stop/go traffic control for deep road repair | Road repair | Tuesday 21 8am-4pm |
High Street, Masterton Lane closed for water main renewal | Water supply, Masterton District Council | Monday 20 7am-6pm
|
Mt Bruce Stop/go northbound traffic control for works to raise level of road shoulder
| Road shoulder | Wednesday 22 8am-5pm |
State Highway 53
Location |
Type of work |
Start date |
Between Wards Line and Bidwills Cutting Stop/go traffic control for deep road repair | Road repair | Tuesday 21 st 8am-4pm |