Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

$
0
0

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for  Friday 17March - Saturday 25 March 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

Friday 17 March - Saturday 25 March 2017

Wellington - Kāpiti

State Highway 1 

  

Location

  
  

Type of work

  
  

Start date

  

Cobham Drive, en route to Wellington Airport

Lane closed to reinstall Akau Tangi sculpture after maintenance

http://www.sculpture.org.nz/the-sculptures/akau-tangi

Wellington City Council

Tuesday 21 st– Wednesday 22 nd 

9am-3pm

Mt Victoria Tunnel

Detour via Newtown or Wellington Harbour bays while tunnel closed for routine maintenance

Tunnel maintenance

Tuesday 21 st

7pm-5.30am

(May open earlier)

Kent Terrace

Southbound lane closed for asphalt resurfacing

Paving

Wednesday 22 nd

7.30pm-5.30am

Vivian Street-Tory Street intersection

Lane closed to install CCTV chamber at traffic lights

Traffic safety

Sunday 19 th– Tuesday 21 st

7pm-5.30am

Thorndon overbridge

Lane closed to replace bridge joints

Bridge

Sunday 19 th– Thursday 23 rd

7pm-5.30am

Seawall, Urban motorway

Southbound lane closed to repair seawalls

Seawall

Sunday 19th – Thursday 23rd

7pm-5.30am

Centennial Highway, Glover Street, southbound off the motorway near bottom of Ngauranga Gorge

Southbound lane closed for bus stop maintenance and footpath repairs

Maintenance

Sunday 19 th– Thursday 23 rd   

7pm-5.30am

Ngauranga Gorge, before Johnsonville northbound off-ramp

Northbound lane closed for road surface repairs

Paving

POSTPONED

Tuesday 21 st

7pm-5.30am

1km south of Churton Park

Southbound lane closed for road surface repairs

Paving

POSTPONED

Tuesday 21 st

7pm-5.30am

Westchester Drive Overbridge, between Churton Park southbound off and on-ramps

Southbound lane closed for asphalt resurfacing

 

Tuesday night detour via Johnsonville ramps for Churton Park and Grenada Village drivers while Churton Park southbound on-ramp  closed

Paving

Sunday 19 th , Monday 20 th

Tuesday 21st

7pm-5.30am

  

Tuesday 21 st

9pm on-ramp closed

Tawa southbound off-ramp to Takapu Road

Lane closed to replace lamppost

Lighting

Sunday 19 th

7pm-5.30am

Porirua, Mungavin southbound off-ramp

Detour via Titahi Bay southbound off-ramp while Mungavin off-ramp closed to install lampposts

Lighting

POSTPONED

Tuesday 21 st– Wednesday 22 nd 

7pm-5.30am

Porirua, northbound off-ramp to Whitford Brown Drive  

Lane closed to maintain lamppost

Lighting

Monday 20 th

7pm-5.30am

Mana Esplanade – Plimmerton

a) Monday, south of Pascoe Avenue intersection, southbound  lane closed to clear sump

b) Tuesday, stop/go to install traffic sensors at Acheron intersection

c) Thursday, southbound lane closed to install broadband cable for   property near Steyne Ave intersection

Drainage, traffic lights, telecoms


a) Monday 20 th 9.30am-3.30pm

b) Tuesday 21 st 7pm-5.30am

c) Thursday 23 rd 9am-3pm

Plimmerton Weigh Station

Northbound lane closed for road surface repairs

Paving

POSTPONED

Tuesday 21 st

7pm-5.30am

Pukerua Bay, rail overbridge to the shops

Stop/go traffic control for road surface repairs

 

Paving

Sunday 19 th

Midnight – 5.30am

Follows work done at Manakau that night

Coast Road, north of Pukerua Bay

Stop/go traffic control to replace damaged guardrail

Guardrail

Monday 20 th– Thursday 23 rd 

8pm-5.30am

Paekakarirki, Sang Sue corner south of Mackays Crossing

Southbound stop/go traffic control to extend project barriers

Transmission   Gully Project

Thursday 23 rd

7pm-5.30am

 

Raumati Straight

Lane closures for work on approach to expressway

Mackays-Peka   Peka  Expressway

Sunday 19 th– Friday 24 th

Various times day and night

Kapiti Expressway

Lane closed to repair damaged guardrail

Guardrail

Friday 24 th

8am-3.30pm

 

Peka Peka passing lane

Northbound lane closed to remove passing lane and protect washed-out culvert.

Passing lane closure

Sunday 12 th– Saturday 18 th  

24 hours

North of Peka Peka passing lane to Te Hapua Road

Stop/go traffic management to repair drain and road

Paving and Drainage

Sunday 19 th– Thursday 23 rd 

7pm-5.30am

Otaki Bridge area, 200m stretch of highway north   of Riverbank Road

Stop/go traffic control

a)  Monday to make repairs ahead of resurfacing

b)  Thursday to resurface the road with asphalt

Paving

Monday 20 th

7pm-5.30am

 

Thursday 23 rd

7pm-5.30am

Manakau south

Lane closed for various road surface repairs through 1km section from South Manakau Road to Gleeson   Road. This work follows other repairs being done elsewhere earlier in the   night

Paving

Sunday 19 th 

7pm - Midnight

Manakau threshold

Lane closed to replace threshold sign

Signs

Monday 20 th 

7am-4pm

Ohau south

Lane closed to raise shoulder heights to road level

Maintenance

Friday 24 th

7am – 3.30pm

State Highway 2     

  

Location

  
  

Type of work

  
  

Start date

  

SH2-Ngauranga Gorge northbound intersection

Detour  along urban motorway to Aotea Quay off-ramp and return via Aotea Quay on-ramp. Intersection closed to install traffic sensors

Traffic lights

Monday 20 th

10pm-5.30am

Normandale to Melling

Lane closed for shoulder and culvert maintenance

Maintenance

Wednesday 22 nd

7pm-5.30am

 

SH2/58 Haywards Hill interchange
Lane closures for interchange works

Stay alert for queues, please focus on driving  rather than slowing down to view project activities

Interchange project

Monday 20 th– Friday 24 th 

9am-4pm

Birchville, Upper Hutt, north of Topaz Street

Stop/go traffic control for chipsealing Friday night – 400m stretch including two bends

 

Speed restrictions (30kph or 50kph) at all other  times. Drivers should take care travelling over chipsealed surfaces. Please   maintain a consistent speed, no heavy braking or sharp turns.

Road   reconstruction

Friday 17 th

Chipsealing   

6.30pm – 5.30am

 

Saturday 18 th– Sunday 19 th 

All day

 

 

 

State Highway 58 

  

Location

  
  

Type of work

  
  

Start date

  

Near Moonshine Road   intersection

Lane closed for road repair

Road repair

Tuesday 21 st

7pm-5.30am

Paremata Road, near Oak Avenue

Stop/go traffic control to install broadband fibre connection

Telecoms

Tuesday 21 st

7pm-5.30am


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>