Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 26 March - Saturday 1 April . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 26 March - Saturday 1 April
State Highway 2
Location |
Type of work |
Start date |
Chapel St, Masterton, south of Russell Street for 150 metres Stop-go traffic control to resurface road with asphalt | Paving | Sunday 26 th – Monday 27 th 7pm-5.30am |
Dixon/Queen/Chapel Streets roundabout, Masterton Stop/go traffic control to resurface roundabout road with asphalt | Paving | Tuesday 28 th, Thursday 30
|
Mt Bruce Stop/go northbound traffic control for works to level road shoulders | Road shoulder | Wednesday 29 th 8am-4pm |
State highway 53
Location |
Type of work |
Start date |
No major works this week |
|
|