Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 26 March - Saturday 1 April . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Sunday 26 March - Saturday 1 April

State Highway 2

     

  

Location

  
  

Type of work

  
  

Start date

  

Chapel St, Masterton, south of Russell Street for 150 metres

Stop-go traffic control to resurface road with asphalt

Link to letter

Paving

Sunday 26 th  – Monday 27 th 

7pm-5.30am

Dixon/Queen/Chapel Streets roundabout, Masterton

Stop/go traffic control to resurface roundabout road with asphalt

Link to letter

Paving

Tuesday 28 th, Thursday 30  - Wednesday 29th

 

Mt Bruce

Stop/go northbound traffic control for works to level road shoulders

Road shoulder

Wednesday 29 th

8am-4pm

State highway 53

  

Location

  
  

Type of work

  
  

Start date

  

No major works this week

 

 


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>