Traffic Notices

$
0
0

Traffic notice for the week 24 - 30 March 2017

Traffic notices provide a brief overview of likely traffic disruptions for the following week. Full closures are also advertised in the Weekend Herald. Traffic notices are complemented by monthly construction updates and quarterly newsletters.

 

ALREADY IN PLACE

  • Narrowed lanes and 80 km/h speed limit northbound between the Papakura Interchange and Hill Road.
  • Narrowed lanes and 80 km/h speed limit southbound between Orams Road and the Papakura Interchange.

 

  TRAFFIC NEXT WEEK

 Northbound

  • Sunday 26 March - Thursday 30 March- Monday 27 March - Night closure of the full northbound motorway from the Takanini Interchange to Hill Road. This includes closure of the northbound on-ramp at Takanini (Great South Road).

 

Southbound

  • Sunday 26 March - Thursday 30 March - Night closure of the full southbound motorway between the Manukau Interchange through to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.

  

UPCOMING WORKS (dates may be subject to change)

  • 8:00pm Saturday 1 April - 8:00am Sunday 2 April - Night closure of the full southbound motorway from Manukau Interchange through to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, SH20-1 Link, Cavendish Drive eastbound on-ramp, and eastbound Puhinui on-ramp link to SH20. 

  • Sunday 2 April - Tuesday 4 April - Night closure of one lane northbound from Walter Strevens Drive Bridge to the Takanini Interchange off-ramp. This includes closure of the northbound off-ramp at Takanini Interchange (Great South Road).

  • Sunday 2 April - Monday 3 April - Night closure of the full  southbound motorway between the Takanini Interchange to Papakura Interchange. This includes closure of the southbound Takanini on-ramp (Great South Road).

  • Tuesday 4 April - Thursday 6 April - Night closure of the full southbound motorway between the Manukau Interchange through to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.

  • Wednesday 5 April - Thursday 6 April - Night closure of two lanes on Great South Road under the Takanini Interchange.

 

Night work on the motorway next week involves pavement works in preparation to asphalt the additional southbound lane. We will also be installing steel, pouring concrete, removing formwork on the pier at Hill Road Bridge and continuing to install noise wall panels. If it rains or ground conditions are too wet, work will be postponed until the next available dry night.

 We have an extended night closure of the full motorway southbound from Manakau to the Takanini Interchange. This is to connect the old Papakura Stream Bridge to the new, by "stitch" pouring concrete. The extended closure is required for the bridge to gain sufficient strength, as vibrations from passing cars can impact on the curing. 

 Work during the night will allow our crews to operate equipment safely while adjacent to the existing traffic lanes. Work in the shoulder and median work zones will continue during the daytime next week, but this will not affect traffic movements.

With the lanes narrowed, there is less time to react to other vehicles and it is important that motorists keep to the 80 km/h speed limit past our work areas. There will be ongoing truck and project vehicle movements accessing the shoulder and median work sites. Keeping both motorists and our team members safe as possible is imperative and we need everyone's help to do this.

As always, we will be doing our best to minimise effects of these works on motorists as much as we can.

We thank you for your patience as we work to improve journey reliability and safety along the Southern Corridor.

If you have any questions or queries, please contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz . Also feel free to visit us at the Project Office located at 8 Great South Road, Takanini.

Detour maps

Southbound Takanini Papakura Detour Map

Southbound Manukau Takanini Detour Map

Northbound Takanini Manukau Detour Map