Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 7 May30 April- Saturday 136 May 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 7 May30 April - Saturday 13Saturday 6 May 2017
State Highway 1
Location |
Type of work |
Hours |
Sun 7 |
Mon 8 th |
Tue 9 |
Wed 10 |
Thu 11 |
Fri 12 |
Sat 13 |
Vivian Street Lane closed to apply long-life, reflective strips over painted lines | Line marking | 7pm-5.30am |
|
| √ | √ | √ |
|
|
The Terrace Tunnel Detour via other motorway off and on-ramps while tunnel closed for monthly maintenance
| Tunnels | 9pm-5.30am |
| √ | |
|
|
|
|
Mt Victoria Tunnel Detour via harbour bays or Newtown while tunnel closed for monthly maintenance | Tunnels | 9pm-5.30am | | | √ | | |
|
|
Ngauranga Gorge Lane closed to clear | Drainage | 7pm-5.30am | √ |
|
|
|
|
|
|
Johnsonville southbound off-ramp Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to wire-brush, waterblast and remove excess bitumen
| Water cutting | 3am-5.30am |
| | | √ | | | |
Tawa southbound on-ramp Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to wire-brush, waterblast and remove excess bitumen | Water cutting | Midnight -2am |
|
| | √ |
| |
|
South of Porirua, Linden Lane closed for centre median construction | Transmission Gully | 7pm-5.30am |
|
| √ | √ | √ |
|
|
Mana Lane closed to apply | Line marking | 7pm-5.30am |
| √ |
|
|
|
|
|
Mana Lane closed to apply long-life, reflective strips over painted lines | Line marking | 7pm-5.30am | √ |
|
|
|
|
|
|
Kapiti Expressway Traffic controls or finishing works | Expressway project | Various times day and night |
| √ | √ | √ | √ | √ | √ |
New Raumati South roundabout site, Poplar Avenue/Old SH1 intersection Closed to traffic while new roundabout built Highway traffic off-ramp, left turn only Local traffic detour via Matai Road, Raumati Road to old SH1 | Expressway project | All day, night |
|
|
| √ | √ | √ | √
|
Peka Peka, Old SH1 Stop/go traffic control to pave Hadfield link road | Expressway project | 7pm-5.30am |
|
|
| √ | √ |
|
|
Old SH1 Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm |
| √ | √ | √ | √ | √ |
|
Te Horo to Manakau – various sites Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to wire-brush, waterblast and remove excess bitumen | Water cutting | 7pm-11pm |
|
|
| √ |
|
|
|
State Highway 2
Location |
Type of work |
Hours |
Sun 7 th |
Mon 8 th |
Tue 9 th |
Wed 10 th |
Thu 11 th |
Fri 12 th |
Sat 13 th |
Kennedy Good Bridge and Major Drive intersections Southbound lane closure, plus occasional stop/go traffic control to resurface with asphalt | Paving | 7pm-5.30am | √ | √ |
|
|
|
|
|
Near Owen Street, Belmont, intersection Northbound lane closed to inspect road sub-surface structure | Analysis | 9.30am-3.30pm |
|
| √ |
|
|
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works | SH2/58 project | Various times day and night | √ | √ | √ | √ | √ | √ |
|
Upper Hutt, Whakatiki Street intersection, north and south Sections of southbound highway and intersection closed. Follow the detour signs Tuesdaynight: Southbound on-ramp open, remainder of intersection closed. Southbound detour via Gibbons Street to Whakatiki. Northbound traffic enter suburb via Gibbons Street intersection Wednesday night: Southbound off-ramp open, remainder of intersection closed. Southbound detour via Whatatiki Street, Shakespeare and Moonshine Roads. Northbound traffic enter suburb via Gibbons Street intersection Thursday night: Southbound on-ramp closed; remainder of intersection open. Southbound detour via Whatatiki Street, Shakespeare and Moonshine Roads. | Paving | 7pm-5.30am |
|
| √ | √ | √ |
|
|
Te Marua, south of golf course Caution required for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
| √ | √ | √ | √ | √ |
|
TeMarua Northbound stop/go traffic control to mark out underground service chambers | Services | 8am-Midday |
|
| √ |
|
|
|
|
Rimutaka Hill Road Stop/go traffic control at various sites to: - Resurface with asphalt south of the summit - Replace signs - Clear drainage channels | Paving, maintenance | 8am-4pm |
| √ | √ | √ | √ | √ |
|
Location |
Type of work |
Hours |
Sun 30 th |
Mon 1st |
Tue 2 nd |
Wed 3 rd |
Thu 4 th |
Fri 5 th |
Sat 6 th |
Urban motorway, Ngauranga Lane closures for project finishing works | Smart Motorway project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Petone on-ramp Detour via Dowse interchange while ramp closed to replace traffic volume sensors | Traffic sensors | 10pm-4.30am |
| √ |
|
|
|
|
|
South of Grounsell Crescent Northbound lane closed to resurface with asphalt | Paving | 7pm-5.30am |
|
|
|
| √ |
|
|
POSTPONED to Sunday and next Monday nights Kennedy Good Bridge intersection Southbound stop/go traffic control to resurface with asphalt | Paving | 7pm-5.30am |
|
|
|
|
|
|
|
North of Block Road, Melling, to south of Haywards Interchange Northbound lane closed for spraying with diluted bitumen to strengthen road surface – various sections Southbound lane closed briefly for 400m south of Liverton Road for spraying with diluted bitumen | Rejuvenation | 9am-4pm May open earlier |
| √ | √ |
|
|
|
|
Totara Park intersection Stop/go traffic control to repair guardrail | Guardrails | 7pm-5.30am |
|
| √ |
|
|
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works | SH2/58 project | Various times | √ | √ | √ | √ | √ | √ |
|
Te Marua, south of golf course Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
| √ | √ | √ | √ | √ |
|
Kaitoke Stop/go traffic control to clear slip | Slip clearing | 7pm-5.30am | √ |
|
|
|
|
|
|
Rimutaka Hill Road Stop/go traffic control at various sites to: -Resurface with asphalt, sites south of the summit -Replace signs -Clear drainage channels -Repair guardrails | Paving, maintenance | 8am-4pm |
| √ | √ | √ | √ | √ |
|
State Highway 58
Location |
Type of work |
Hours |
Sun 7 th |
Mon 8 th |
Tue 9 th |
Wed 10 th |
Thu 11 th |
Fri 12 th |
Sat 13 th |
Haywards Hill Stop/go traffic control to remove shiny surfaces on chipseal – various sites. Using suction truck to wire-brush, waterblast and remove excess bitumen | Water cutting | 7pm-11pm |
|
|
|
| √ |
|
|
Duck Creek, near James Cook Drive Stop/go traffic control to reinstate line markings near residential development | Line marking | 7pm-5.30am |
| √ |
|
|
|
|
|
Location |
Type of work |
Hours |
Sun 30 th |
Mon 1st |
Tue 2 nd |
Wed 3 rd |
Thu 4 th |
Fri 5 th |
Sat 6 th |
SH2/58 Haywards Hill interchange Stop/go traffic control to install ducts under the road | SH2/58 | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Paremata Road, from Postgate Drive to Paremata Stop/go traffic control to install new grates over sumps | Drainage | 7pm-5.30am |
| √ | √ | √ |
|
|
|