Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2 July 25 June - Saturday 8Saturday 1 July 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

 

Sunday 2 July25 June - Saturday 8Saturday 1 July 2017

State Highway 1  

                                 

 

 

 

 

Southern Mana Esplanade

Southbound clearway lane closed to reline sewer

Wellington Water

9am-3pm

 

   √

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 225ndth        

  
  

Mon 326rdth 

  
  

Tue 427th   

  
  

Wed 528th      

  
  

Thu 629nd  

  
  

Fri 730th      

  
  

Sat 81thst 

  

Basin Reserve, Rugby StreetMt Victoria Tunnel closed

LaneDETOUR FOR VEHICLES via   Newtown or harbour bays while tunnel closed to removefor resurfacing near Basin  scaffoldingReserve traffic signals

Tunnel pathway OPEN for  pedestrians and cyclists

ScaffoldingPaving

7pm-5.30am9pm-5.30am

 

 

 

 

 

 

 

Wellington Urban Motorway Molesworth Street   overbridge, Thorndonoverbridge

Northbound lane closed to install trafficLane closed to install traffic sensor wires

Traffic monitoring

9pm-5.30am Monday7pm-11pm

7pm-5.30am Tuesday

 

 

 

 

 

 

Tawa, south of the interchangeTawa southbound on-ramp lamppost installation

Southbound lane closed   to install end of guardrailLane closure and brief ramp closures while lighting upgrade completed

Barrier installationLighting

7pm-5.30am9pm-5.30am

 

 

 

 

 

 

Linden, south of Porirua

Lane closed for centre mediancentre   median construction

Transmission Gully project

9pm-5.30am7pm-5am

Sun/Mon

7pm-5.30am

Other nights

     

Mana Esplanade

Lane closed for road   marking

Road marking

9pm-5.30am10pm-5.30am

 

 

Plimmerton, St Andrews RoadPlimmerton weigh station off-ramp

Southbound lane closed for power pole maintenanceLane closed to make road repairs

TelecomsRepairs

9am-3.30pm9am-4pm

 

    

    

 

 

 

 

 Coast Road, about halfway between Pukerua  Bay and Fisherman’s TablePaekakariki north, Sang Sue Corner

Stop/go traffic control for footpath repaircontrol to replace barriers

Footpath repairTransmission Gully project

7pm-5.30am10pm-5am

 

 

 

 

 

 

 

Kapiti Expressway – Raumati Straight and Peka PekaPeka   Peka

Expect traffic controls at various times for finishing works

Expressway   project

Various times during the day

 

 

 

   

Otaihanga roundabout, Old SH1SH1, Paraparaumu to Levin

Lane closed to work on gardensmaintain   power poles – various locations

Vegetation controlElectra

8.30am-4pm8.30am-4.30pm

 

 

    √

 

 

 

Otaki Gorge Road intersection

Caution: follow traffic controltraffic control signs while new road markings installed for changeover from Give Way toWay to Stop at intersection

Stop/go for drivers exitingdrivers   exiting Otaki Gorge Road

Road marking

7pm-5.30am10pm-5.30am

 

 

 

 

 

 

                                                                                          

 

                                                               

State Highway 2

                                       

7pm-5.30am

 

 

 

North of Melling intersection

Lane closed both north and southbound for repairs to crib wall in median barrier

Barrier repair

7pm-5.30am

 

 

 

   

 

 

 

 

 

 

 

Upper Hutt, north of Norana Road, Brown Owl

Caution required for altered lane layout beside road repair

Road repair

8.30am-4pm

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 225ndth        

  
  

Mon 326rdth 

  
  

Tue 427th   

  
  

Wed 528th      

  
  

Thu 629nd  

  
  

Fri 730th      

  
  

Sat 81thst 

  

Normandale overbridge to MellingOwen Street, Belmont, intersection

SouthboundNorthbound lane closed to repair kerb and layclosed to resurface widened road with asphalt

Kerb repairSafety upgrade

7pm-5.30am

 

 

 

   

 

SH2/58 Haywards Hill interchange

Lane closures for   interchangefor interchange finishing works

SH2/58 project

Various times during the day

 

   √

 

Whakatiki Street intersection, Upper Hutt

DETOUR for northbound trafficnorthbound   traffic turning into Upper Hutt: Turn at Gibbons Street

DETOUR for southbound   traffic: Follow signs via Whakatiki Street, Shakespeare Avenue and Moonshine   Road to rejoin SH2 south

Traffic signals

10pm-5.30am

Upper Hutt, north of Topaz Street, Birchville

Stop/go traffic control tocontrol to install new guardrail

Barrier renewal

7pm-5.30am

 

 

 

Rimutaka Hill RoadTe Marua, south of the golf club

Stop/go traffic control to clear drainage channelsremove machinery from riverbank erosion control site

DrainageRiverbank works

 

8am-4pm9am-3.30pm

 

 

 

 

 

 

 

                                                          

                                                                                        

                                     

State Highway 58 

                                       

                                        

 

 

 

 

 

Haywards Hill passing lane

Eastbound lane closed to repair median wire rope barrier

Barrier repair

7pm-5.30am

 

 

 

 

 

 

Paremata Road, from Bayview Road to boat sheds

Westbound lane stop/go traffic control to clear slip and drainage channels

Roadside clearing

7pm-5.30am

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 225ndth        

  
  

Mon 326rdth 

  
  

Tue 427th   

  
  

Wed 528th      

  
  

Thu 629nd  

  
  

Fri 730th      

  
  

Sat 81thst 

  

Haywards Hill intersection finishing works

Near the electricity sub-station

Lane closed to install   electronic sign

SH2/58 project

7pm-5.30am9.30am-4.30pm

 

                                     

                                        

                          

                                   

                                      

             

 


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>