Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week.  We’ll keep you posted on future works and have regular updates on local radio stations. 

State Highway 1

Tree maintenance

Monday night and Tuesday to Thursday during the day.

Ohau and Old Hautere Rd 

Dig outs – general maintenance

Tuesday and Thursday respectively during the day.  Lane/contraflow.

Ohau and Manakau
Crews will be doing watercutting.  Traffic will be controlled by stop/go.

Watercutting

Sunday to Thursday nights Stop/go.

Waikanae Rail Bridge
Crews are resurfacing the road at night.  Traffic will be controlled by stop/go.

Resurfacing

Wed and Thursday nights, Stop/go.

LocationType of workStart date

Tawa ‘S’ bends heading northParaparaumu rail overbridge
This work is happening on MondayCrews are working at night to lay a new road surface.  Traffic heading south will be diverted by Boat City and detour along Ruahine and Tongariro Streets and at rejoin the highway by Kapiti lights. 

Resurfacing

Tuesday and Wednesday nights

Pukerua Bay 
Crews are working at night through Pukerua Bay to Thursday duringresurface the day.road and do road repairs.  Traffic will be controlled by stop/go 

Road repairs and resurfacing

Sunday, Monday and Thursday nights

State Highway 2

Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites.  Keep to the temporary speed limit for your safety and the safety of our work crews.  Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.

General maintenance and repair

Monday

Guardrail and other maintenance repair work 

Tuesday

LocationType of workStart date

Ngauranga to Petone
Crews will be resurfacing the northbound lanes, setting up from 7pm and working through the night to 5:30am. One lane will remain open at all times.  A temporary speed limit of 30kph and speed humps will be in place through the work site.  Work is expected to take 17 nights. There will be no impact on traffic during the day.

Resurfacing

Ongoing nightworks

Matarawa Road intersection and WaihakekeRimutaka Hill Road

Crews will be workingreplacing guardails and doing maintenance work by Kaitoke and over the Rimutaka Hill Road during the day.  Traffic will be controlled by stop/go. 

State Highway 58

LocationType of workStart date

There are maintenance works happening by the Paremata Boating Club on Thursday during the day and by Spinnaker Drive  on Wednesday during the day. Traffic will be controlled by stop/go.

Drainage works and guardrail repairs.

Wednesday and Thursday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>