Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week. We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
ResurfacingFebruaryTerrace Tunnel and Arras Tunnel
Both tunnels are closed for maintenance. The Terrace Tunnel is closed on Tuesday night and the Arras Tunnel on Wednesday night. Please follow the signed diversions.
Maintenance
FebruaryTerrace Offramp
One lane of the offramp will be closed during the day from Monday to Thursday for maintenance work
Maintenance
FebruaryMana Esplanade
On Wednesday night crews will be resurfacing between 7pm and 5:30am. Lane closures will be in place.
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
Location | Type of work | Start date |
---|---|---|
Ngauranga to Petone | Resurfacing | 17 February |
River Road | Resurfacing | 16 February |
Kaitoke Lakes | Resurfacing | February |
Masterton | Resurfacing | 9 February |
Carterton | Resurfacing | 14 February |
State Highway 58
Location | Type of work | Start date |
---|---|---|
Postgate Roundabou t | Chipsealing | February |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Location | Type of work | Start date |
---|---|---|
Coast Road |
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
Location | Type of work | Start date |
---|---|---|
Greytown | Resurfacing | 9 February |
Mangaroa | Guardrail installation | February |
Rimutaka Hill Road | Resurfacing | February |
Featherston | Resurfacing | 9 February |
Carterton | Resurfacing | 10 February |
State Highway 58
Location | Type of work | Start date |
---|---|---|
Haywards, Hutt side, east of Mt Cecil Road | Chipsealing | 10 February |