Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 11 September 2016 . We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
Location | Type of work | Start date |
---|---|---|
Paraparaumu | Tree felling | Sunday |
Mana Esplanade | Resurfacing | Sunday to Thursday nights |
Coast Road | Drainage clearing | Sunday night |
Terrace Tunnel and Mt Victoria tunnels | Routine maintenance | Monday / Tuesday nights respectively |
Tawa Interchange Underpass | Vegetation removal | Thursday night |
Johnsonville southbound offramp | Lighting pole replacement work | Wednesday and Thursday night |
Kuku Bridge | Dig outs | Thursday night |
Te Horo (Old Red Shed café) | Pavement repairs | Monday to Friday |
Paekakariki | Barrier repairs | Tuesday and Wednesday nights |
State Highway 2
Location | Type of work | Start date |
---|---|---|
Rimutaka Hill Road Bridge 6 | Guardrail repairs | Wednesday and Thursday |
Rimutaka Hill Road | Repair Electronic Warning Sign | Monday and Tuesday |
Te Marua to Kaitoke | Slip clearing | Tuesday |
State Highway 58
Location | Type of work | Start date |
---|---|---|
Haywards | Hydroseeding of bank | Monday and Tuesday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.