Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from Sunday 27 November 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

Tuesday, 29 NovemberMonday 28 November 
Caution: Haywards - between Brittons and Mt Cecil Road. Due to the new chipseal on this route, a temporary speed limit of 30km remains in place tonight. Drivers, please be prepared for delays or use an alternative route.Tonight: Haywards – between Brittons and Mt Cecil Road – chipsealing takes place tonight after being cancelled last night because of high winds and rain. Speed restrictions Wednesday.

State Highway 1

Location

Type of work

Start date

Pukerua Bay
Traffic will be controlled by stop/go for resurfacing works.  Allow extra time for your journey.

Resurfacing

Sunday to Thursday night

Plimmerton to Pukerua Bay
Lane closure while crews clear slip from recent floods.

Slip clearance work

Sunday night

Takapu Road
Traffic will be controlled by stop/go to allow crews to do bridge maintenance work.

Bridge maintenance

Sunday to Thursday night

Tinakori Road off ramp
Shoulder closure for garden maintenance work.

Gardening

Friday

Vivian Street to Willis Street
Lane closure for UFB installation.

UFB works

Tuesday night

Wellington Road
There will be an altered lane layout while crews install UFB cable between Ruahine St and Kilbirnie Crescent.

UFB works

Sunday to Thursday night

State Highway 2

Location

Type of work

Start date

Melling to Block Road
There will be lane closures and diversions for resurfacing works.  Please drive carefully through the work site.

Resurfacing

Sunday to Thursday

Rimutaka Hill Road
Traffic will be controlled by stop/go all week during the day for slip repairs, drainage and guardrail repair works.

Maintenance works

Monday to Thursday

State Highway 58

Location

Type of work

Start date

Haywards – between Brittons and Mt Cecil Road
Traffic will be controlled by stop/go for chipsealing works.  Please drive carefully over the new road surface on Monday and stick to the temporary speed limit.
Crews will also be clearing slips on Monday night.

Chipsealing

Sunday night/Monday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>