Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits during the works and in the following days.  If you’re driving around the Wairarapa, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from Monday 28 November 2016

 

Tuesday, 29 NovemberMonday 28 November
Postponed: No chipsealing works in the Wairarapa tonight.Postponed: Opaki Overbridge and Kaitoke Loop Road works – new dates to be advised.

State Highway 2

Location

Type of work

Start date

Masterton south passing lanes (from Ravensdown)
Traffic will be controlled by stop/go while crews chipseal the highway south of Ravensdown.

Chipsealing

Tuesday to Thursday night

Andersons Line to Carterton
Traffic will be controlled by stop/go while for chipsealing work. 

Chipsealing

Wednesday and Thursday nights

Opaki overbridge
Traffic will be controlled by stop/go traffic management for the final stage of chipsealing north of Opaki School.

Chipsealing

Monday and Tuesday

North of Kaitoke Loop Road
Traffic will be controlled by stop/go traffic management for chipsealing.

Chipsealing

Monday and Tuesday night

Rimutaka Hill Road
Traffic will be controlled by stop/go traffic management for chipsealing, barrier repairs, clearing drains and clearing slips.

Maintenance

Monday to Thursday

All network
Road crews are installing new lane marking arrows on the road surface at multiple locations across the region all week.  Traffic will be controlled by stop / go at these locations.

Installing directional arrows

Sunday to Thursday  

State Highway 53

Location

Type of work

Start date

No planned roadworks along SH53 this week  

 

 

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>