Information about roadworks in the Nelson-Marlborough-Tasman region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 12 December 2016. 5 December 2016 . We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 6
Location | Type of Work | Start Date |
Collins Valley Traffic will be controlled by stop/go while crews install guardrail | Surface Repairs | Wednesday to Thursday |
Gladstone Road Single traffic lane each direction | Surface Repairs | Monday to Thursday |
Aniseed Valley Intersection Traffic will be controlled by stop/go while crews carry out surfacing repairs | Resealing | Monday to Friday |
Kawatiri Intersection Traffic will be controlled by stop/go while crews carry out surfacing | Intersection Upgrade | Tuesday to Friday |
State Highway 60
Location | Type of Work | Start Date |
Riwaka Township | Resealing | Monday to Wednesday |
Appleby Bridge | Surface Repairs | Monday to Friday |
State Highway 63
Location | Type of Work | Start Date |
Rainbow Area | Drainage maintenance | Wednesday to Thursday |
State Highway 65
Location | Type of Work | Start Date |
Boundary Road | Drainage maintenance | Tuesday to Friday |
Shenandoah | Drainage maintenance | Tuesday to Friday |
Shenandoa h | Road widening (bank cutting) | Tuesday to Friday |
Note: If bad weather should strike, work will be postponed to the next suitable day / night
Location | Type of Work | Start Date |
Whangamoa | Guardrail Installation | Wednesday to Thursday |
Collins Valley | Pre-seal repairs | Monday to Friday |
Spooners Saddle | Pre-seal repairs | Monday to Friday |
Gentle Annie | Pavement Repairs | Monday |
Aniseed Valley Intersection | Resealing | Tuesday to Thursday |
State Highway 60
Location | Type of Work | Start Date |
Riwaka Township | Resealing | Monday to Wednesday |
Takaka Hill (Nelson Side) | Construction of retaining structure | Monday to Friday |
State Highway 63
Location | Type of Work | Start Date |
Rainbow Area | Drainage maintenance | Tuesday to Friday |
State Highway 65
Location | Type of Work | Start Date |
Boundary Road | Drainage maintenance | Tuesday to Friday |
Shenandoah | Drainage maintenance | Tuesday to Friday |
Shenandoa h | Road widening (bank cutting) | Tuesday to Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable day / night