Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 22 January - Saturday 28 January 2017 follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 22 January - Saturday 28 January 2017
State Highway 1
Location | Type of work | Start date |
Ngauranga southbound flyover Lane closed for guardrail repairs | Repairs | Tuesday 24 th - Thursday 26 th 9pm-5.30am |
Churton Park to Tawa Northbound lane closed for drainage works | Maintenance | Tuesday 24 th - Wednesday 25 th 9pm-5.30am |
South of Tawa interchange Southbound lane closed for tree removal, occasional delays | Maintenance | Wednesday 25 th - Thursday 26 th 7pm-5.30am |
Porirua, northbound lanes after Mungavin Overbridge to Whitford Brown Avenue intersection at Waitangirua Lane closed for northbound road subsurface renovation and asphalt resurfacing
| Paving
| Monday 23 rd -Thursday 26 th 7pm-5.30am
|
Mana Esplanade Lane closed for telecoms installations | Telecoms | Wednesday 25 th - Thursday 26 th 9am-4pm |
Coast Road, north of Pukerua Bay Stop/go traffic control for road renovation and asphalt resurfacing, north and southbound | Paving | Monday 23 rd North and southbound 9pm-5.30am Tuesday 24 th Northbound 8pm-5.30am |
Paekakariki Speed restriction for highway traffic, stop/go in and out of township for reinstatement of central highway median barrier | Paving | Tuesday 24 th - Thursday 26 th 9pm-5.30am |
Paraparaumu, near southbound traffic lights Lane closed for road repair | Maintenance | Tuesday 24 th 9am-4pm |
Peka Peka intersection Lane closed for installation of electronic messaging board | MacKays2PekaPeka Expressway | Wednesday 25 th 8am-4pm |
Otaki River Bridge south to Te Horo Stop/go traffic control for chipseal resurfacing northbound and southbound lanes Followed by speed restrictions while chip beds in, sweeping and line-marking | Chipseal | POSTPONED Tuesday 24 th - Thursday 26 th chipsealing 7pm-5.30am
|
Passing lane, Forest Lakes south to Otaki roundabout Passing lane closed to manage returning holiday traffic | Traffic control | Monday 23rd 12noon - 8pm
|
State Highway 2
Location | Type of work | Start date |
Underneath Petone overbridge MOTORCYCLISTS TAKE EXTRA CARE, SLOW DOWN TO60KPH The skid –resistant topcoat will be removed and cannot be replaced until March while the new asphalt cures. | Paving | Ongoing caution |
SH2/58 Interchange Lane closed for construction of interchange | Interchange | Tuesday 24 th - Friday 27 th 9am-4pm |
Moonshine Hill Road intersection Stop/go traffic control for road subsurface renovation and asphalt resurfacing | Paving | Monday 23 rd - Wednesday 25 th 9pm-5.30am |
Totara Park intersection Stop/go traffic control for road subsurface renovation and asphalt resurfacing | Paving | Tuesday 24 th - Thursday 26 th 7pm-5.30am |
State Highway 58
Location | Type of work | Start date |
Paremata Road between Postgate Drive and James Cook Drive closed Detour in place through Whitby, road closed for tree-removal, slip and culvert clearing Heavy vehicles, please use SH1 and SH2 if possible | Maintenance | Tuesday 24th 9am-4pm |