Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 22 January - Saturday 28 January 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 22 January - Saturday 28 January
State Highway 2
Andersons Line south for 300m
Stop/go traffic control for chipsealing
Speed restrictions following days while chip beds in
Chipsealing
Thursday 26 th
7pm-5.30am
Location | Type of work | Start date |
Rimutaka Hill Road heading north, tourist 'dot matrix' arrows Stop/go traffic control for installing tactile 'drive on the left' arrows on highway through the region
| Road marking | Tuesday 24 th - Thursday 26 th 7pm-5.30am |
High Street, Masterton Lane closed for watermain renewal | Water | Tuesday 24 th - Friday 27 th 7am-6pm |
Mikimiki Stop/go traffic control for road repair | Maintenance | Wednesday 25 th 8am-4pm |
State Highway 53
Location | Type of work | Start date |
Revans Street, Featherston Stop/go traffic control for electronic sign board maintenance | Maintenance | Tuesday 24 th 9am-4pm |