Quantcast
Viewing all articles
Browse latest Browse all 2629

Wellington region maintenance programme

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2316 April- Saturday 2922 April 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

Sunday 16 April - Saturday 22 April 2017

Anzac WeekendWeekend:

  • Friday and Saturday 10am-8pm, SH1 Te Horo to Otaki northbound passing lane closed

  • Tuesday 25 th Anzac Day 10am-8pm, SH1 Forest Lakes to Otaki southbound passing lane closed

  • Tuesday Anzac Day, Paraparaumu, Old State Highway 1 Amohia Street  closed for Anzac Parade

State Highway 2/58 Haywards intersection:  take care getting used to the new layout.

Sunday 23 April - Saturday 29 April 2017State Highway 1                      

State Highway 1  

                        

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

Cobham Drive

Southbound lane closed to take core samples for road structure analysis

Analysis

7pm-5.30am

 

 

 

 

 

 

Basin Reserve, Sussex Street

Lane closed to level service chamber lids

Services

7pm-5.30am

 

 

 

 

 

Vivian Street, corner Taranaki Street

Lane closed for hydrant repairs

City Care

7pm-Midnight

 

 

 

 

 

Vivian Street, from Tory Street to Kent Terrace

Lane closed to level service chamber lids

Services

7pm-5.30am

 

 

 

 

 

Wellington urban motorway, south of Aotea onramp

Northbound lane closed to repair guardrails

Barriers

8am-4pm

 

 

 

 

 

 

Ngauranga Gorge, Newlands southbound off-ramp

Detour to bottom of   gorge and back up again while off-ramp is closed to resurface with asphalt

Paving

10pm-5.30am

 

 

 

 

 

Ngauranga Gorge, northbound and southbound opposite   Kiwi Point

Lane closed to spray   bitumen emulsion for road surface rejuvenation. Traffic control trucks will   lead vehicles through when sprayer is operating – brief periods

Paving

9.30am-4pm

 

 

 

 

 

Porirua, Whitford Brown traffic lights southbound

Southbound lane closed to lay skid-resistant surface

Paving

7pm-5.30am

 

 

 

 

 

Plimmerton

Southbound lane closed to maintain water valves

Wellington Water

9.30am-3.30pm

 

 

 

Pukerua Bay, northern end

Stop/go traffic control to replace threshold signs

Signage

9pm-2.30am

 

 

 

 

 

 

Raumati Straight

Southbound lane closures for expressway works

Kāpiti  Expressway

Various times day and night

 

 

 

Paraparaumu, Old SH1

Southbound lane closed to maintain roadside gardens

KCDC

9am-4.30pm

 

 

 

 

 

Old SH1, north of Waikanae

Stop/go traffic control to clear drains

Drainage

8am-4pm

 

 

 

 

 

 

Peka Peka

Stop/go traffic control to install wire rope barrier

Kāpiti   Expressway

7pm-5.30am

 

 

 

 

 

 

Peka Peka passing lane

Northbound lane closed to remove passing lane

Passing lane removal

Closed 24 hours

Forest Lakes to Otaki passing lane

Southbound passing lane   closed for holiday traffic

Safety

10am-8pm

 

 

 

 

 

 

                   

State Highway 2

                          

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

Grounsell Crescent to Melling

Southbound lane closed   to take core samples for road structure analysis

Analysis

7pm-5.30am

 

 

 

 

 

SH2/58 Haywards Hill interchange

Lane closures for   interchange works and installing forewarning signs at Fergusson Drive, Silverstream,   and Hebden Crescent               

SH2/58 project

Various times during the day

 

 

 

 

Te Marua, south of golf course

Stop/go traffic control   for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am- 3.30pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control   to resurface with asphalt – various sites

Paving

8am-4pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control   to repair truck caution sign

Signage

8am-4pm

 

 

 

 

 

 

Rimutaka Hill Road, north of the summit

Stop/go traffic control   to maintain drains

Drainage

8am-4pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 16 th

  
  

Mon 17 th

  
  

Tue 18 th

  
  

Wed 19 th

  
  

Thu 20 th

  
  

Fri 21 st

  
  

Sat 22 nd

  

Near Wellington Airport – SH1 Calabar Road to Broadway   roundabout

Lane closures and stop/go traffic control as required to resurface Calabar Road and the   roundabout

Paving

8.30pm-5.30am

 

 

 

 

Aotea Quay off-ramp

Exit motorway via other off-ramps while road repairs underway

Wellington City Council

10pm-5.30am

   

  

Vivian Street, from Willis to Victoria Streets

Lane closed to remove   scaffold

Workzone

7pm-5.30am

 

 

 

 

 

POSTPONED

Vivian Street, corner Taranaki Street

Lane closed for hydrant   repairs

City Care

7pm-Midnight

 

 

 

 

 

 

 

Porirua, Mungavin interchange

Lane closed for bridge   joint works

Porirua City Council

7pm-5.30am

 

 

 

 

 

Porirua, southbound Titahi Bay off-ramp to   Mungavin on-ramp

Lane closed to spray   bitumen emulsion - road surface rejuvenation

Link to notice

Surface spray

9.30am-4pm

 

 

 

 

 

 

Pukerua Bay, northern end

Stop/go traffic control to replace threshold signs

Signage

2am-5.30am

 

 

 

 

 

 

 

Raumati Straight

Southbound lane closures for project works

Kapiti  Expressway

Various times day and night

 

 

 

Old SH1, Paraparaumu to Waikanae

Lane closed at various sites for power pole maintenance

Electra

8.30am-4.30pm

 

 

 

Peka Peka passing lane

Northbound lane closed   to remove passing lane

Passing lane removal

Closed 24 hours

State Highway 2

                             

State Highway 58 

                          

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

No major works   scheduled

 

 

 

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 16 th

  
  

Mon 17 th

  
  

Tue 18 th

  
  

Wed 19 th

  
  

Thu 20 th

  
  

Fri 21 st

  
  

Sat 22 nd

  

Ngauranga to Hutt Valley off-ramp

Southbound lane closed for cycleway and lane marking

Urban motorway

7pm-5.30am

 

 

 

 

Ngauranga to Petone

Northbound lane closed to repair fibre broadband

Telecoms

7pm-5.30am

 

 

 

 

 

 

Melling traffic lights

Lane closed for traffic sensor maintenance

Signals

7pm-5.30am

 

 

 

 

 

POSTPONED

Hebden Crescent

Northbound lane closed to spray bitumen emulsion - road surface rejuvenation

Surface spray

9am-3.30pm

 

 

 

 

 

 

 

SH2/58 Haywards Hill interchange

CHANGEOVER TO NEW INTERCHANGE AT EASTER WEEKEND

Lane closures for interchange works and installing forewarning signs at Fergusson Drive, Silverstream   and Hebden Crescent              

SH2/58 project

Various times day and night

 

 

 

Silverstream

Lane closed for garden works

Vegetation

9am-4pm

 

 

 

 

 

 

Te Marua, south of golf course

Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am-3.30pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control for resurfacing with asphalt – various sites

Link to map

Paving

8am-4pm

 

 

 

State Highway 58 

                             

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 16 th

  
  

Mon 17 th

  
  

Tue 18 th

  
  

Wed 19 th

  
  

Thu 20 th

  
  

Fri 21 st

  
  

Sat 22 nd

  

Paremata Road, west of Joseph Banks Drive

Stop/go traffic control   to resurface short section of highway

Paving

7pm-1pm

 

 

 

 

 

 

Paremata Road

From Postgate Drive to James Cook Drive

From James Cook Drive to Joseph Banks Drive

Detour through Whitby   while roadside maintenance underway

Trucks, please avoid using this area if possible

Clean-up

9am-3pm

 

 

 

 

 

 

 

 

 

Near Harris Road

Stop/go traffic control   to replace concrete barriers

Barriers

9pm-Midnight

 

 

 

 

 

 

 

 


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>