Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 2629

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2316 April - Saturday 29Saturday 22 April . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Anzac Day 25 April: Afternoon commemorations at Anzac Bridge, Mt Bruce. The highway is open but please take care for people walking beside the road.

Sunday 16 April - Saturday 22 April

SH2/58 Haywards intersection: The temporary speed limit helps while you are gettingtake care while getting used to the new layout.

Sunday 22 April - Saturday 29 April

State Highway 2

                                 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

Carterton south, Matarawa Road intersection north of Waiohine River Bridge

Stop/go traffic control to level road shoulders

Road shoulders

8am-4pm

 

 

 

 

 

 

Clareville

Stop/go traffic control   to improve skid resistance by waterblasting a slippery-when-wet section of chipsealed road

 

8am-4pm

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control to resurface with asphalt – various sites

Link to map

Paving

8am-4pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control to repair truck caution sign

Signage

8am-4pm

 

 

 

 

 

 

Rimutaka Hill Road, north of the summit

Stop/go traffic control to maintain drains

Drainage

8am-4pm

 

 

 

 

 

 

                   

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 16 th

  
  

Mon 17 th

  
  

Tue 18 th

  
  

Wed 19 th

  
  

Thu 20 th

  
  

Fri 21 st

  
  

Sat 22 nd

  

Mt Bruce to Rimutaka Hill Road

Stop/go traffic control at various sites to check road structure

Pavement testing

7pm-5.30am

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control for asphalting resurfacing – various sites

Link to map

Paving

8am-4pm

 

 

 

 

                       

State Highway 53

                            

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

No major works this week

 

 

 

 

 

 

 

 

 

                       

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 16 th

  
  

Mon 17 th

  
  

Tue 18 th

  
  

Wed 19 th

  
  

Thu 20 th

  
  

Fri 21 st

  
  

Sat 22 nd

  

No major works this week

 

 

 

 

 

 

 

 

 

                            

 


Viewing all articles
Browse latest Browse all 2629

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>